Before You Build

Before you build: 5 things to check before construction starts

Land documents, the right authority, development potential, building regulations and the approval route. Get these five right and most approval problems never happen.

પોસ્ટ વાંચો2 મિનિટ
(01)બ્લોગ અને સમાચાર

તાજેતરના લેખો

Before You Build

Buying a plot in Ahmedabad? Check these 7 things before you pay

A plot is only worth what you are allowed to build on it. Seven checks to run before you sign, and what a plot feasibility report tells you.

પોસ્ટ વાંચો2 મિનિટ
B.U. Permission

Buying an old property? Check its approval and B.U. status first

A resale building can look perfect and still carry approval gaps. What to review before you buy, and why the B.U. certificate matters to banks and future buyers.

પોસ્ટ વાંચો2 મિનિટ
Plan Approval

AMC, AUDA, GMC, GUDA, GIDC or Dholera SIR: which authority applies to your property?

The first question in any approval is who approves it. How jurisdiction works around Ahmedabad and Gandhinagar, and why it changes everything that follows.

પોસ્ટ વાંચો2 મિનિટ
Plan Approval

Plan passing in Ahmedabad: what it is and the documents you'll need

Plan passing is how your building drawings get sanctioned before construction. What the process involves and the documents that usually go into the file.

પોસ્ટ વાંચો2 મિનિટ
Plan Approval

Planning a commercial building? Check these approvals first

Road width, permitted use, parking and fire requirements shape a commercial project long before the elevation does. What to settle before you finalise the design.

પોસ્ટ વાંચો2 મિનિટ
GIDC

Industrial shed and factory approval: documents generally required

Whether inside a GIDC estate or on private industrial land, a factory approval file needs more than drawings. The documents and checks that usually apply.

પોસ્ટ વાંચો2 મિનિટ
Plan Approval

High-rise building approval: the preliminary checks that matter

High-rise projects add layers of scrutiny: structure, fire, airport height clearance and more. What to verify before committing to a tower design.

પોસ્ટ વાંચો2 મિનિટ
Plan Approval

Plotting project? Check development regulations before you plan roads and plots

Dividing land into plots looks simple on a map. Roads, common plot and authority rules decide how many saleable plots you actually get.

પોસ્ટ વાંચો2 મિનિટ
Before You Build

Planning a weekend villa? Check these permissions first

Owning the land is not the same as being allowed to build on it. What to verify before building a farmhouse or weekend home outside the city.

પોસ્ટ વાંચો2 મિનિટ
Plan Approval

Common reasons building approval applications get delayed

Most delays are not about the building. They come from document mismatches, drawing errors and missing NOCs. What goes wrong and how pre-submission checking prevents it.

પોસ્ટ વાંચો2 મિનિટ
Plan Approval

From feasibility to B.U.: how an approval file moves

Approval Check, plan passing, development permission, NOCs and B.U. permission. The full route, step by step, and what happens at each stage.

પોસ્ટ વાંચો2 મિનિટ
Plan Approval

Approval partner for architects and developers

Architects design and manage the client. Prosperaa handles submissions, authority coordination and follow-up. How the collaboration works.

પોસ્ટ વાંચો2 મિનિટ
Plan Approval

Fire NOC and airport NOC: when your project needs them

Two clearances that catch owners by surprise. What they are, what triggers them and why they should be planned alongside the main approval.

પોસ્ટ વાંચો2 મિનિટ
Impact Fee

ઇમ્પેક્ટ ફી 2022: તમારું બાંધકામ નિયમિત કરાવવાની સરળ માર્ગદર્શિકા

માર્જિન ઉલ્લંઘન? વધારાનો માળ? વપરાશમાં ફેરફાર? ગુજરાત ઇમ્પેક્ટ ફી યોજના શું આવરી લે છે, કેટલો ખર્ચ થાય છે અને વિન્ડો બંધ થાય તે પહેલાં કેવી રીતે અરજી કરવી તે અહીં છે.

પોસ્ટ વાંચો2 મિનિટ
B.U. Permission

અમદાવાદમાં બી.યુ. પરમિશન: સંપૂર્ણ દસ્તાવેજ ચેકલિસ્ટ

બી.યુ. પરમિશન વિના મિલકત ખરીદવી, વેચવી કે ગીરો મૂકવી દર વર્ષે અઘરી બની રહી છે. અહીં જરૂરી દરેક દસ્તાવેજ અને ઇન્સ્પેક્શન પ્રક્રિયા, પગલે-પગલે.

પોસ્ટ વાંચો2 મિનિટ
News

અમદાવાદ–ધોલેરા સેમી હાઈ-સ્પીડ રેલ કોરિડોર: ગુજરાતના વિકાસને મળશે નવી દિશા

અમદાવાદ–ધોલેરા સેમી હાઈ-સ્પીડ રેલ કોરિડોર: ગુજરાતના વિકાસને મળશે નવી દિશા

પોસ્ટ વાંચો2 મિનિટ
Gujarat News

અમદાવાદનો ડ્રાફ્ટ ડેવલપમેન્ટ પ્લાન 2041: તમારા પ્લોટ માટે શું અર્થ છે

નવા ટીપી રોડ, સુધારેલા ઝોન, બદલાયેલી FSI — આગામી ડેવલપમેન્ટ પ્લાન AUDA વિસ્તારમાં જમીનની કિંમત બદલી નાખશે. તેને કેવી રીતે વાંચવો અને તમારા સર્વે નંબર માટે શું તપાસવું.

પોસ્ટ વાંચો2 મિનિટ
GIDC

GIDC પ્લાન મંજૂરીમાં ફેક્ટરી માલિકોની 5 ભૂલો

મંજૂરી પહેલાં બનેલાં વિસ્તરણ, ખૂટતાં સ્ટ્રક્ચરલ સર્ટિફિકેટ, અવગણાયેલા માર્જિન નિયમો — GIDC એસ્ટેટમાં અમે સૌથી વધુ જોતી ભૂલો, અને દરેકથી કેવી રીતે બચવું.

પોસ્ટ વાંચો2 મિનિટ
સંપર્ક

તમારી મંજૂરી એક કૉલથી શરૂ થાય છે.

પહેલો પરામર્શ મફત. પ્રામાણિક શક્યતા-તપાસ. નિશ્ચિત, પારદર્શક કાર્યક્ષેત્ર.

AMCAUDAGMCGUDAGIDCધોલેરા SIRનગર નિયોજન
AMCAUDAGMCGUDAGIDCધોલેરા SIRનગર નિયોજન